mC.R.E. No. 24.

Kowloon Canton Railway.

BRITISH SECTION ESTIMATE.

Main Head Sub. Head Work Bridgework. Hiner. Bridge No.45. Two 12 ft. span girder bridges landed at Kowloon, at peg 94'700. Quantity DESCRIPTION Unit Rate AMOUNT 7,600 Excavation in foundations. 10/- $76.00 2,980 Punwring and shuttering. 2,580 Concrete in foundations. $1,000.00 $2,580.00 Masonry in superstructure. 35/- 100 Masonry in headstone and coping. 40 $1,023.60 1,180 Dry stone backing. $1,154.00 Two Span girder bridges landed at Kowloon, Transport, erection & painting. $300/- each $600.00 Total $4,297.10 Contingencies 10% $429.71 Grand Total $4,726.81

Edit History

2026-06-04 21:26:51 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
mC.R.E. No. 24. Kowloon Canton Railway. BRITISH SECTION ESTIMATE. Main Head Sub. Head Work Bridgework. Hiner. Bridge No.45. Two 12 ft. span girder bridges landed at Kowloon, at peg 94'700. Quantity DESCRIPTION Unit Rate AMOUNT 7,600 Excavation in foundations. 10/- $76.00 2,980 Punwring and shuttering. 2,580 Concrete in foundations. $1,000.00 $2,580.00 Masonry in superstructure. 35/- 100 Masonry in headstone and coping. 40 $1,023.60 1,180 Dry stone backing. $1,154.00 Two Span girder bridges landed at Kowloon, Transport, erection & painting. $300/- each $600.00 Total $4,297.10 Contingencies 10% $429.71 Grand Total $4,726.81
Baseline (Original)
یا •Cowlieft .qewlisЯ notneD noolwod NOINBD JJ 516 NOI ماد KOITO92 HAITISIS 3TAMIT23 i LA mC.R.E. No. 24. Kowloon Canton Railway. 108 BRITISH SECTION ESTIMATE. best nielt booH du Main Head Sub. Head Work Bridgework. Hiner. Bridge No.45. Two 12 ft. apan at peg 94'700. Quantity. DESCRIPTION. AMOUNT. Rate. Unit. $ Cts. 7,600 | Excavation in foundations. 黑龙江熊 Punwing and titoring. 2,980 Concrete in foiidations. 2,580 Masonry in muperstructure. 100 Masonry in hedstone and eo,ing. 1,180 Dry atone backing. */- 0.It 10% 900 10/- 76 00 1,000 00 35/~ 40 1,023: BO 1,154 00 ૩૪ ૪૭ 200 0C 11 } two Span gamers 1- f^. landed at Kowloon, Transport, creation & painting. 300/- each 600円 00 2001 00 IBIOT Total 4,297 10 01 zsiɔnigniino IRJOT bngD Grand Total Contingincies 10% 429 71 226 01
2026-06-04 21:26:51 · Baseline
View content

یا

•Cowlieft

.qewlisЯ notneD noolwod

NOINBD

JJ

516

NOI

ماد

KOITO92 HAITISIS

3TAMIT23

i

LA

mC.R.E. No. 24.

Kowloon Canton Railway.

108

BRITISH SECTION

ESTIMATE.

best nielt

booH du

Main Head

Sub. Head

Work

Bridgework.

Hiner.

Bridge No.45.

Two 12 ft. apan

at peg 94'700.

Quantity.

DESCRIPTION.

AMOUNT.

Rate. Unit.

$

Cts.

7,600 | Excavation in foundations.

黑龙江熊

Punwing and titoring.

2,980 Concrete in foiidations.

2,580

Masonry in muperstructure.

100 Masonry in hedstone and eo,ing.

1,180 Dry atone backing.

*/- 0.It

10% 900

10/-

76 00

1,000 00

35/~

40

1,023: BO

1,154 00

૩૪ ૯ ૬ ૪૭

200

0C

11

}

two

Span gamers 1- f^. landed at Kowloon,

髓 Transport, creation & painting.

300/- each

600円

00

2001

00

IBIOT

Total

4,297

10

01 zsiɔnigniino

IRJOT bngD

Grand Total

Contingincies 10%

429

71

226 01